Water Reservoirs

CUWCD 15MG Reservoir Improvements

Services Water Reservoirs Water Treatment Project Details Description This project focused on critical upgrades to improve the efficiency, reliability, and service life of the prestressed concrete finished water reservoir. At the reservoir outlet sump, MGC removed and replaced the 48-inch butterfly valve and 6-inch mud valve. Crews also replaced the existing FRP washdown piping and

CUWCD 15MG Reservoir Improvements Read More »

Provo Rock Canyon Water Treatment Plant

Services Booster Pump Stations Disinfection Water Reservoirs Project Details Description MGC Contractors constructed Provo City’s new 30 MGD Rock Canyon Water Treatment Facility, a state-of-the-art ultrafiltration membrane drinking water treatment plant – the largest ultrafiltration facility in Utah. Scope included a main treatment and administration building with a laboratory, along with coagulant injection, ozone and

Provo Rock Canyon Water Treatment Plant Read More »

Buckeye Farallon Water Campus

Services Booster Pump Stations Water Treatment Water Reservoirs Project Details Description The City of Buckeye selected MGC Contractors, partnering with Hazen and Sawyer, to deliver Phase 1 of the Farallon Water Campus. The campus was built with a firm initial capacity of 2.0 MGD and planned to expand to 16 MGD. MGC’s most impactful value

Buckeye Farallon Water Campus Read More »

Glendale Thunderbird Reservoir

Services Water Reservoirs Project Details Description For the City of Glendale, MGC Contractors completed a comprehensive rehabilitation of the Thunderbird Reservoir, restoring its roof structure, liner system, and supporting components. The reservoir combines concrete slopes, asphalt floors, and concrete columns supporting a steel roof structure. MGC’s original scope focused on the roof: removing the existing

Glendale Thunderbird Reservoir Read More »

An aerial view of a large water tank in the desert.

Summit 2 Water Tank Project

Services Water Reservoir Pipelines Project Details Description The Town of Prescott Valley selected MGC for their Summit 2 Water Tank Project which featured a 3.0 MG prestressed concrete water storage reservoir. The project included water supply lines, 18” and 20” ductile iron yard piping, valves, storm drains, perimeter fencing, solar electrical system, SCADA programming, and

Summit 2 Water Tank Project Read More »

A group of pipes and valves in front of a building.

Queen Creek Water and Wastewater Facilities General Construction

Services Wastewater Treatment Water Treatment Water Reservoir Booster Pump Station Valve Maintenance Lift Stations Disinfection Odor Control Pipelines Project Details Description With over 30 Job Orders, this JOC program has included a variety of water production, water treatment, and wastewater treatment services. On-site construction services have included: pre-stressed concrete water reservoirs, dual-zone vertical turbine booster

Queen Creek Water and Wastewater Facilities General Construction Read More »

A worker is working on a large tank in a field.

Hwy 46 West Water System Expansion

Services Water Reservoir Pump Station Pipelines Project Details Description The Highway 46 West Water System Expansion project consisted of the following elements:  9,400 LF of 24-inch distribution piping, 8,713 LF of 16-inch distribution piping, 4 jack and bore locations, rock sawing, 0.5 MG post tension water reservoir, 2.5 MGD booster pump station, 3 split case

Hwy 46 West Water System Expansion Read More »

Scroll to Top