The Highway 46 West Water System Expansion project consisted of the following elements: 9,400 LF of 24-inch distribution piping, 8,713 LF of 16-inch distribution piping, 4 jack and bore locations, rock sawing, 0.5 MG post tension water reservoir, 2.5 MGD booster pump station, 3 split case pumps, 3.5 MGD booster pump station, 3 split case pumps, Other requirements included chemical injection system, electrical, instrumentation, SCADA, 86 residential PRV’s and 3 distribution line PRVs.
Key Features
- Construction Manager at Risk (CMAR)
- In Association with Freese & Nichols Engineering
- Conceptual design through operation in less than 9 months
- 3.5 MGD Pump Station
- 2.5 MGD Pump Station
- 0.5 MG Water Storage Tank
- New Braunfels, TX