Employee owned mgc quality performance value.

Pipelines

An aerial view of a large water tank in the desert.

Summit 2 Water Tank Project

Services Water Reservoir Pipelines Project Details Description The Town of Prescott Valley selected MGC for their Summit 2 Water Tank Project which featured a 3.0 MG prestressed concrete water storage reservoir. The project included water supply lines, 18” and 20” ductile iron yard piping, valves, storm drains, perimeter fencing, solar electrical system, SCADA programming, and

Summit 2 Water Tank Project Read More »

An aerial view of a baseball field under construction.

Salt River Fields

Services Water Treatment Pump Stations Arsenic Removal Pipelines Project Details Description As the CMAR, MGC delivered a 2.5 MG post tension concrete reservoir fully buried beneath a new parking lot.  The project included an indoor booster pump station housing (3) 75 HP vertical turbine pumps, (3) 200 HP vertical turbine pumps, and a hydro-pneumatic tank

Salt River Fields Read More »

A worker is working on a large tank in a field.

Hwy 46 West Water System Expansion

Services Water Reservoir Pump Station Pipelines Project Details Description The Highway 46 West Water System Expansion project consisted of the following elements:  9,400 LF of 24-inch distribution piping, 8,713 LF of 16-inch distribution piping, 4 jack and bore locations, rock sawing, 0.5 MG post tension water reservoir, 2.5 MGD booster pump station, 3 split case

Hwy 46 West Water System Expansion Read More »

A water treatment plant with pipes and pipes.

Arrowhead Ranch WRF Improvements

Services Wastewater Treatment Lift Stations Disinfection Pipelines Project Details Description The City of Glendale selected MGC as the CMAR to replace the existing headworks building, bar screens, washer compactors, and splitter box. Additional facility improvements included grit chamber rehabilitation, odor control system replacements, a new cloth disk filter system, and plant-wide electrical upgrades including full

Arrowhead Ranch WRF Improvements Read More »

A group of construction workers standing in front of a concrete structure.

EPCOR Water Pecan Water Reclamation Plant Phase IV Expansion

Services Water Reservoir Booster Pump Station Pipelines Project Details Description This Reclamation Plant Expansion Project features a new expansion and demolition of major existing components on a 24/7 active operational plant. The new expansion includes modifications to the sewer main influent, a new influent pump station, force main, headworks facility, chlorine contact basin, yard piping,

EPCOR Water Pecan Water Reclamation Plant Phase IV Expansion Read More »

An aerial view of a water treatment facility.

Sonoran Mountain Ranch Booster Pump Station Project

Services Disinfection Pipelines Pump Stations Project Details Description The Sonoran Mountain Ranch Booster Pump Station (6SMR B301 BPS) supplies water to the elevated Sonoran Mountain Ranch community to the site’s neighboring Aloravita Development and provides capacity planning for future developments along the Jomax corridor. The site consists of three (3) booster pumps, a 4,000-gallon surge

Sonoran Mountain Ranch Booster Pump Station Project Read More »

Scroll to Top