Pipelines

Provo Rock Canyon Water Treatment Plant

Services Booster Pump Stations Disinfection Water Reservoirs Project Details Description MGC Contractors constructed Provo City’s new 30 MGD Rock Canyon Water Treatment Facility, a state-of-the-art ultrafiltration membrane drinking water treatment plant – the largest ultrafiltration facility in Utah. Scope included a main treatment and administration building with a laboratory, along with coagulant injection, ozone and

Provo Rock Canyon Water Treatment Plant Read More »

Salitrillo WWTP Expansion

Services Disinfection Lift Stations Pipelines Project Details Description MGC Contractors completed a comprehensive expansion and rehabilitation of the Salitrillo Wastewater Treatment Plant, increasing treatment capacity from 5.0 MGD to 7.5 MGD while the plant remained in continuous operation. Work spanned both the Upper and Lower Plants and upgraded preliminary treatment, secondary treatment, biosolids processing, pumping,

Salitrillo WWTP Expansion Read More »

Buckeye Farallon Water Campus

Services Booster Pump Stations Water Treatment Water Reservoirs Project Details Description The City of Buckeye selected MGC Contractors, partnering with Hazen and Sawyer, to deliver Phase 1 of the Farallon Water Campus. The campus was built with a firm initial capacity of 2.0 MGD and planned to expand to 16 MGD. MGC’s most impactful value

Buckeye Farallon Water Campus Read More »

An aerial view of a large water tank in the desert.

Summit 2 Water Tank Project

Services Water Reservoir Pipelines Project Details Description The Town of Prescott Valley selected MGC for their Summit 2 Water Tank Project which featured a 3.0 MG prestressed concrete water storage reservoir. The project included water supply lines, 18” and 20” ductile iron yard piping, valves, storm drains, perimeter fencing, solar electrical system, SCADA programming, and

Summit 2 Water Tank Project Read More »

An aerial view of a baseball field under construction.

Salt River Fields

Services Water Treatment Pump Stations Arsenic Removal Pipelines Project Details Description As the CMAR, MGC delivered a 2.5 MG post tension concrete reservoir fully buried beneath a new parking lot.  The project included an indoor booster pump station housing (3) 75 HP vertical turbine pumps, (3) 200 HP vertical turbine pumps, and a hydro-pneumatic tank

Salt River Fields Read More »

A worker is working on a large tank in a field.

Hwy 46 West Water System Expansion

Services Water Reservoir Pump Station Pipelines Project Details Description The Highway 46 West Water System Expansion project consisted of the following elements:  9,400 LF of 24-inch distribution piping, 8,713 LF of 16-inch distribution piping, 4 jack and bore locations, rock sawing, 0.5 MG post tension water reservoir, 2.5 MGD booster pump station, 3 split case

Hwy 46 West Water System Expansion Read More »

A water treatment plant with pipes and pipes.

Arrowhead Ranch WRF Improvements

Services Wastewater Treatment Lift Stations Disinfection Pipelines Project Details Description The City of Glendale selected MGC as the CMAR to replace the existing headworks building, bar screens, washer compactors, and splitter box. Additional facility improvements included grit chamber rehabilitation, odor control system replacements, a new cloth disk filter system, and plant-wide electrical upgrades including full

Arrowhead Ranch WRF Improvements Read More »