Employee owned mgc quality performance value.

Arrowhead Ranch WRF Improvements

Services

A set of blue and white clock icons available for purchase on MGC Services.

Wastewater Treatment

A yellow water pump icon on a black background from MGC Services.

Lift Stations

A water drop with a check mark on it, representing MGC Services.

Disinfection

An icon of a water pipe with a faucet on it, designed for MGC Services.

Pipelines

Project Details

Description

The City of Glendale selected MGC as the CMAR to replace the existing headworks building, bar screens, washer compactors, and splitter box. Additional facility improvements included grit chamber rehabilitation, odor control system replacements, a new cloth disk filter system, and plant-wide electrical upgrades including full redundancy throughout the plant. The 9.0 MGD peak flows were successfully controlled by implementation of 30 separate MOPOs. The design phase consisted of MOPO development, cost estimating, constructability reviews, scheduling, long-lead material procurement, subcontractor selection, and value engineering. Cost comparison of permanent piping versus bypass pumping saved the owner several hundred thousand dollars. We coordinated with the design engineer and our electrical consultant, MGC completely modified the plants emergency power to a more reliable system and saved the owner five hundred thousand dollars.

Key Features

  • In Association with Carollo and Black & Veatch
  • 9.0 MGD Wastewater Treatment Plant
  • Ultraviolet System
  • Administrative Building
  • Chemical Feed Buildings
  • Tertiary Filter Structure
  • Odor Control System
  • Glendale, AZ
 
Scroll to Top