Lift Stations

A water treatment plant with several pumps and valves, designed by MGC Projects.

Fountain Hills Sanitary District – Wastewater Treatment Plant

Services Reclamation Lift Stations Influent Pump Stations Project Details Description In a program consisting of a series of four projects, the Fountain Hills Sanitary District (FHSD) retained MGC as the CMAR and Carollo as the design engineer to rehabilitate and replace numerous aspects of the plant, including upgrades to the infuent pump station, aerobic digester […]

Fountain Hills Sanitary District – Wastewater Treatment Plant Read More »

An aerial view of a solar farm at sunset.

Martinez IV WWTP & Collection System

Services Wastewater Treatment Lift Stations Pipelines Project Details Description As part of the design-build team, MGC constructed a new 50,000-GPD WWTP (with a future capacity of 2.0-MGD) and wastewater collection system. Facilities included automatic screens, a mechanical rotating fixed film biotreatment basin, a 50-foot clarifier, UV disinfection and two 30-cubic-yard sludge dewatering boxes. The sewer

Martinez IV WWTP & Collection System Read More »

A water treatment plant with pipes and pipes.

Arrowhead Ranch WRF Improvements

Services Wastewater Treatment Lift Stations Disinfection Pipelines Project Details Description The City of Glendale selected MGC as the CMAR to replace the existing headworks building, bar screens, washer compactors, and splitter box. Additional facility improvements included grit chamber rehabilitation, odor control system replacements, a new cloth disk filter system, and plant-wide electrical upgrades including full

Arrowhead Ranch WRF Improvements Read More »

An aerial view of a large water treatment plant.

Roberto R. Bustamante Wastewater Treatment Plant Headworks Improvements

Services Wastewater Treatment Pipelines Pump Stations Project Details Description MGC performed preconstruction phase services from 0% to final design and is currently performing construction services. Critical elements to this wastewater treatment plant include a fifty-two feet deep lift station and live tie-ins to the plant’s 108” influent sewer main at a depth of 42 feet.

Roberto R. Bustamante Wastewater Treatment Plant Headworks Improvements Read More »