Roberto R. Bustamante Wastewater Treatment Plant Headworks Improvements
Services
Wastewater Treatment
Pipelines
Pump Stations
Project Details
Description
MGC performed preconstruction phase services from 0% to final design and is currently performing construction services. Critical elements to this wastewater treatment plant include a fifty-two feet deep lift station and live tie-ins to the plant’s 108” influent sewer main at a depth of 42 feet. Temporary bypass pumping of the influent is required to maintain normal plant treatment operations throughout all construction phases. Improvements and expansions to the headworks facility include six 350 HP pumps, multi-rake bar screens, screening conveyors, washer compactors, aerated grit basins, grit pumping, dewatering, and bio trickling odor control filters.
Key Features
- In Association with Carollo Engineers
- Anticipated Completion: May 2025
- El Paso, TX
- Multiple GMPs
- 110 MGD Lift Station
- Temporary bypass pumping maintained normal treatment operations
- Live tie-ins to 108” influent at 42’ depth
- Construction Manager at Risk (CMAR)