This Reclamation Plant Expansion Project features a new expansion and demolition of major existing components on a 24/7 active operational plant. The new expansion includes modifications to the sewer main influent, a new influent pump station, force main, headworks facility, chlorine contact basin, yard piping, screening facility, grit removal facility, odor control system, new aeration basin, new building with four 150 HP blowers, electrical upgrades, and standby generators.

Key Features

  • AZ Water Reuse Project of the Year 2023
  • In Association with GHD Engineers
  • Completed November 2022
  • EPCOR Water – San Tan Valley, AZ
  • Hydroelectric Generator
  • Multiple GMPs
  • Temporary bypass pumping maintained normal treatment operations
  • Capacity Increased to 6 MGD
  • Design-Build