Employee owned mgc quality performance value.

Featured

An aerial view of a baseball field under construction.

Salt River Fields

Services Water Treatment Pump Stations Arsenic Removal Pipelines Project Details Description As the CMAR, MGC delivered a 2.5 MG post tension concrete reservoir fully buried beneath a new parking lot.  The project included an indoor booster pump station housing (3) 75 HP vertical turbine pumps, (3) 200 HP vertical turbine pumps, and a hydro-pneumatic tank […]

Salt River Fields Read More »

A group of pipes and valves in front of a building.

Queen Creek Water and Wastewater Facilities General Construction

Services Wastewater Treatment Water Treatment Water Reservoir Booster Pump Station Valve Maintenance Lift Stations Disinfection Odor Control Pipelines Project Details Description With over 30 Job Orders, this JOC program has included a variety of water production, water treatment, and wastewater treatment services. On-site construction services have included: pre-stressed concrete water reservoirs, dual-zone vertical turbine booster

Queen Creek Water and Wastewater Facilities General Construction Read More »

A worker is working on a large tank in a field.

Hwy 46 West Water System Expansion

Services Water Reservoir Pump Station Pipelines Project Details Description The Highway 46 West Water System Expansion project consisted of the following elements:  9,400 LF of 24-inch distribution piping, 8,713 LF of 16-inch distribution piping, 4 jack and bore locations, rock sawing, 0.5 MG post tension water reservoir, 2.5 MGD booster pump station, 3 split case

Hwy 46 West Water System Expansion Read More »

Scroll to Top