Trinity Well Field Membrane Treatment Project

Services

A diagram of a water system with a drop of water, created by MGC Services.

Water Treatment

A isometric image of two water tanks and a house, serviced by MGC Services.

Water Reservoir

A blue robot from MGC Services on a white background.

Pump Station

A water drop with a check mark on it, representing MGC Services.

Disinfection

An icon of a water pipe with a faucet on it, designed for MGC Services.

Pipelines

Project Details

Description

The project consisted of a 4 MGD membrane treatment plant with a 100 x 100 pre-engineered metal building with 1500 SF of tenant finish out; 30’ diameter, cast in place, concrete feed water tank; 30’ diameter, cast in place, concrete backwash clarifier, backwash recovery station, thirty 100 hp membrane feed pumps, two strainers, three PALL Transverse Membrane Racks with 54 modules per rack, clean in place system, neutralization system, two blowers, compressed air system, stainless steel water and air piping from 1” to 18”, a water lift station and 2,500 linear feet of 6” force main.

Key Features

  • Construction Manager at Risk (CMAR)
  • In Association with Freese & Nichols Engineering
  • 4 MGD Water Treatment Plant
  • PALL Transverse Membrane Racks
  • 100 x 100 pre-engineered metal building
  • New Braunfels, TX