Water System Improvements – Osborn Plant
Services
![A diagram of a water system with a drop of water, created by MGC Services.](https://mgccontractors.com/wp-content/uploads/2022/09/Picture2-removebg-preview.png)
Water Treatment
![A blue robot from MGC Services on a white background.](https://mgccontractors.com/wp-content/uploads/2022/09/Picture5-removebg-preview.png)
Pump Stations
![Water drop icon png - MGC Services](https://mgccontractors.com/wp-content/uploads/2022/09/Picture3-removebg-preview.png)
Arsenic Removal
![An icon of a water pipe with a faucet on it, designed for MGC Services.](https://mgccontractors.com/wp-content/uploads/2022/09/Picture7-removebg-preview.png)
Pipelines
Project Details
Description
This was MGC’s second CMAR services project for SRP-MIC. The Project included the following elements: A partially buried 2.5 MG post tension concrete reservoir, 3 – 50 HP vertical turbine pumps, 3 – 100 HP vertical turbine pumps, drilling and equipping 2 remote wells, booster pump facility including a 5,000-gallon hydro-pneumatic tank, maintenance building, electrical and disinfection building. MGC also installed a 4,500 GPM coagulation/filtration Arsenic removal system. Over 5 miles of waterline was installed within public rights-of-way as part of a complex interconnected distribution system feeding residences and businesses. Service to sensitive commercial facilities were carefully sequenced, upgraded, and maintained operations without interruption.
Key Features
- In Association with Freese & Nichols, Inc.
- 4,500 GPM Coagulation/filtration Arsenic Removal System
- 2.5 MG Water Reservoir
- Booster Pump Station
- 2 Remote Production Wells
- Hydro-pnuematic Tank System
- 30 Feet Deep Wet Well
- 6 Miles Off-site Pipeline
- Scottsdale, AZ