Groundwater Treatment

Buckeye Farallon Water Campus

Services Booster Pump Stations Water Treatment Water Reservoirs Project Details Description The City of Buckeye selected MGC Contractors, partnering with Hazen and Sawyer, to deliver Phase 1 of the Farallon Water Campus. The campus was built with a firm initial capacity of 2.0 MGD and planned to expand to 16 MGD. MGC’s most impactful value

Buckeye Farallon Water Campus Read More »

A water treatment plant in a dirt field constructed by MGC Projects.

Phoenix Wells 301 and 303

Phoenix Wells 301 & 303 Services Well Drilling & Equipping Groundwater Treatment Disinfection Project Details Description MGC constructed two well sites (301 and 303), drilled, tested, and equipped a well on each site, and installed associated water lines. Additional project features included water treatment systems, chlorination systems, electrical buildings, and stormwater improvements. At each site,

Phoenix Wells 301 and 303 Read More »

An aerial view of a baseball field under construction.

Salt River Fields

Services Water Treatment Pump Stations Arsenic Removal Pipelines Project Details Description As the CMAR, MGC delivered a 2.5 MG post tension concrete reservoir fully buried beneath a new parking lot.  The project included an indoor booster pump station housing (3) 75 HP vertical turbine pumps, (3) 200 HP vertical turbine pumps, and a hydro-pneumatic tank

Salt River Fields Read More »

Scroll to Top