Description
MGC constructed two well sites (301 and 303), drilled, tested, and equipped a well on each site, and installed associated water lines. Additional project features included water treatment systems, chlorination systems, electrical buildings, and stormwater improvements.
At each site, MGC installed yard piping, electrical equipment, shade canopy, APS transformer, EI&C, SCADA, vertical turbine pumps, discharge piping, and pump-to-waste line with new pump to waste reservoir, backwash reservoir, surge tank system, two arsenic vessels from an existing City of Phoenix site, arsenic piping/valves, prefabricated chemical building with equipment, grading, drainage, retention basin, perimeter security fencing, and gates.
Key Features
- Construction Manager at Risk (CMAR)
- Well Site Construction
- Arsenic Removal
- SCADA
- Utility Coordination