Steven M. Clouse Water Recycling Center (SMC WRC) First Stage Aeration Basin Diffuser Grid Repairs Project, SAWS Job No. 25-0101
- Date Posted |
Project Details
Submission
Proposals shall be submitted electronically via email (txbids@mgccontractors.com) until December 10, 2024 at 3 PM. Suppliers and Subcontractors desiring to submit proposals can access documents via the SAWS website. MBE and WBE firms are highly encouraged to participate in this project. No pre-proposal meeting will be held.
Project Details
MGC Contractors is seeking proposals from suppliers and subcontractors for the Steven M. Clouse Water Recycling Center (SMC WRC) First Stage Aeration Basin Diffuser Grid Repairs Project, SAWS Job No. 25-0101.
Project Scope
The proposed scope of work will include furnishing all labor, materials, equipment, and incidentals required to perform the repairs of the fine bubble diffuser system at the SMC WRC. The contractor will demolish the end drain lines within the basin; install new drain lines with newly designed guide supports; and install additional anchor and guide supports as depicted in the design drawings. The scope of work will be conducted for all ten (10) basins of the First Stage fine bubble diffuser systems, as shown on the Drawings, and as specified herein.