MGC Contractors completed critical dewatering system improvements at the Snyderville Basin Water Reclamation District’s East Canyon Water Reclamation Facility. The work increased biosolids processing capacity, improved operational reliability, and modernized aging infrastructure. MGC demolished the facility’s three existing dewatering centrifuges and replaced them with new high-efficiency rotary press dewatering systems. The project also included new waste activated sludge (WAS) piping and drainage systems, modifications to the existing polymer feed system, and structural and concrete modifications to support the new equipment. Additional improvements included a new compressed air system serving both the rotary presses and filter air scour operations, electrical power and controls upgrades fully integrated with the facility’s existing systems, and renovations to the administration building.
Because the facility had to stay in full operation, MGC carefully sequenced the work, taking one dewatering unit out of service at a time while the others kept running. Each new unit was installed and commissioned before the next was decommissioned, so new mechanical, electrical, and process systems were integrated without interrupting plant operations. MGC self-performed approximately 70% of the work.
Key Features
- In collaboration with Carollo Engineers
- Three centrifuges replaced with rotary presses
- New WAS piping and drains
- Polymer feed system modifications
- New compressed air system
- Electrical and controls integration
- Structural and concrete modifications
- Admin building renovations
- Phased work, no plant downtime
- 70% self-performed