Project Details

Description

MGC Contractors completed a comprehensive expansion and rehabilitation of the Salitrillo Wastewater Treatment Plant, increasing treatment capacity from 5.0 MGD to 7.5 MGD while the plant remained in continuous operation. Work spanned both the Upper and Lower Plants and upgraded preliminary treatment, secondary treatment, biosolids processing, pumping, and disinfection systems, including TPDES permitting. New construction included two 100-foot secondary clarifiers with galvanized mechanisms, RAS/WAS pump stations, a biosolids holding tank, an effluent flume, a post-aeration structure, an effluent pump station, combined effluent structures, a screening channel, and a new pre-engineered electrical building. Existing facilities were improved through influent screw and pump replacements at both lift stations, upsized aeration equipment in the aeration basin carrousels, rehabilitation of three existing clarifiers, headworks fine screen and grit vortex system improvements, UV disinfection upgrades, dewatering improvements with solids load conveyors, reclaimed water pumping, and renovations to the administration building and laboratory.

Integrating new facilities into an active treatment plant required careful sequencing, strategic staging of existing equipment, and extensive coordination. MGC developed and executed a bypass pumping plan to install 24-, 36-, and 42-inch yard piping. MGC also completed the excavation, backfill, and concrete work for the new structures, along with site work, electrical improvements, and instrumentation and controls. Together, these improvements expanded plant capacity, enhanced biosolids processing, and improved the plant’s operational reliability and process performance.

See All Services

Key Features

  • In collaboration with Freese and Nichols
  • 5.0 to 7.5 MGD expansion
  • No interruption to plant operations
  • Two new 100′ secondary clarifiers
  • RAS/WAS and effluent pump stations
  • Biosolids holding tank
  • UV disinfection upgrades
  • Headworks and grit improvements
  • Bypass pumping and large-diameter yard piping
  • New electrical building