MGC Contractors constructed Provo City’s new 30 MGD Rock Canyon Water Treatment Facility, a state-of-the-art ultrafiltration membrane drinking water treatment plant – the largest ultrafiltration facility in Utah. Scope included a main treatment and administration building with a laboratory, along with coagulant injection, ozone and chlorine gas disinfection, and chemical backwash systems. Supporting infrastructure includes a 2 MG clearwell with an associated drain vault and overflow structure, a high-service pump station, ductile iron and steel transmission mains with a valve vault, a mill race pipeline and diversion structure, and natural gas generator facilities. The project was completed with comprehensive electrical, controls, security, paving, landscaping, and site restoration improvements. MGC self-performed extensive mass and structural excavation, trenching, underground utility and pipeline installation, structural concrete, equipment setting, and site development, and closely coordinated the trades working across the site.

Construction took place through all seasons on a tightly constrained site next to residences, offices, and major thoroughfares. MGC carefully sequenced the work, maintained safe and controlled site access, and coordinated deliveries, equipment, and material handling to keep the project on schedule while minimizing impacts on the surrounding community. Significant, sustained dewatering was required throughout excavation and underground construction, and MGC adapted its methods and support systems to varied structure types, depths, and soil conditions.

See All Services

Key Features

  • In collaboration with AECOM, Hansen Allen & Luce
  • 30 MGD ultrafiltration membrane plant
  • Ozone and chlorine disinfection
  • 2 MG clearwell
  • High-service pump station
  • DIP and steel transmission mains
  • Major structural concrete
  • Self-performed excavation and dewatering
  • Constrained urban site
  • All-season construction