For the City of Glendale, MGC Contractors completed a comprehensive rehabilitation of the Thunderbird Reservoir, restoring its roof structure, liner system, and supporting components. The reservoir combines concrete slopes, asphalt floors, and concrete columns supporting a steel roof structure. MGC’s original scope focused on the roof: removing the existing roof panels and clips, adding structural steel beams and support, repairing girders and purlins, upgrading connections, and profiling and recoating areas identified by the engineer before installing a new aluminum roof. During roofing installation, MGC found that the reservoir liner was failing prematurely and brought it to the City’s attention. The scope was then expanded to remove and dispose of the existing liner and geotextile underlayment and to install a new geotextile underlayment and XP5PW liner system. Additional improvements included expansion joints, floor restoration, diffuser piping improvements, refurbished batten strips and hardware, check valves, and a water sample pump.
The reservoir sits within a popular multi-use park next to active trails, and its exterior slopes form an earthen dam regulated by the Arizona Department of Water Resources (ADWR). MGC coordinated closely with the engineer and ADWR throughout the project, including sealing concrete and concrete-to-asphalt cracks identified by ADWR. Early risk identification, proactive scope alignment with the City, careful planning around public areas, and well-sequenced tie-ins allowed MGC to absorb the added liner work and deliver a fully restored reservoir with a significantly extended service life.
Key Features
- In collaboration with Wilson Engineers
- Complete roof replacement
- Structural steel and girder repairs
- Liner failure identified early
- New XP5PW liner system
- Floor and crack repairs
- Diffuser piping improvements
- ADWR-regulated earthen dam
- Active public park setting