For El Paso Water’s Fred Hervey Water Reclamation Plant, MGC Contractors delivered a complete new lime treatment train, built from the ground up and integrated into the plant’s existing advanced treatment process. MGC handled the full scope, from excavation and structural concrete to the train’s core process components: a lime reactor clarifier, a recarbonation clarifier, effluent launders and covers, mixers, gates, and a carbon dioxide chemical feed system. Two new masonry buildings supported the process. The lime building houses a complete lime handling system, including the silo, conveyors, slaking, slurry and aging tanks, degritting, a delivery loop, and polymer dosing. The sludge building contains new sludge pumps and handling equipment. New piping connected the train to the plant’s existing sand filters.

MGC also installed submersible sump pumps, horizontal split case pumps, specialty coatings, miscellaneous metals, and the process control, electrical, and instrumentation systems that tie the train together. Because the plant stayed in operation throughout construction, MGC planned and executed large tie-ins to existing systems in close coordination with plant staff, so the new train came online without disrupting ongoing treatment. The result was expanded lime treatment and recarbonation capacity, giving El Paso Water greater reliability and flexibility at one of its key reclamation facilities.

See All Services

Key Features

  • Complete new treatment train
  • Lime reactor and recarbonation clarifiers
  • Masonry lime and sludge buildings
  • Full lime slaking and delivery system
  • CO₂ chemical feed system
  • Polymer dosing system
  • Large tie-ins to existing systems
  • Major electrical and controls