Description
This project focused on critical upgrades to improve the efficiency, reliability, and service life of the prestressed concrete finished water reservoir. At the reservoir outlet sump, MGC removed and replaced the 48-inch butterfly valve and 6-inch mud valve. Crews also replaced the existing FRP washdown piping and supports with Schedule 80 PVC, and removed and replaced the reservoir’s baffle curtains, installing them on a new concrete curb structure.
MGC also completed extensive rehabilitation work throughout the facility. This included concrete and mechanical piping repairs to address corrosion and spalling, coating replacement, and removal and replacement of construction joint caulking within the 15 MG reservoir. The same cleaning, recaulking, and concrete repair work was performed in the plant’s adjacent 2 MG finished water reservoir. Together, these targeted improvements strengthen the long-term functionality and dependability of a key part of the region’s water treatment infrastructure.
Key Features
- In Association with Carollo Engineers
- Improved reliability and service life
- 2 MG reservoir concrete repairs
- 48″ butterfly and 6″ mud valve replacement
- Schedule 80 PVC washdown piping
- New baffle curtains and concrete curb
- Corrosion and spalling repairs
- Joint recaulking in both reservoirs
- Coating replacement