Buckeye Farallon Water Campus
Project Details
Description
The City of Buckeye selected MGC Contractors, partnering with Hazen and Sawyer, to deliver Phase 1 of the Farallon Water Campus. The campus was built with a firm initial capacity of 2.0 MGD and planned to expand to 16 MGD. MGC’s most impactful value engineering idea came early in design. Instead of a conventional standalone pump station paired with a higher-cost cast-in-place reservoir, MGC proposed a 2.8 MG partially buried prestressed concrete tank with a 10,000-gpm booster pump station built directly on the tank deck. Placing the pump station on top of the reservoir reduced the site footprint, eliminated a separate structure, and delivered substantial cost savings, while still serving multiple pressure zones. Combined with a well characterization program that identified groundwater blends requiring minimal early treatment, phased GMP packages, and continuous cost control, this approach cut the projected cost from about $120 million to a final delivered cost of $48.8 million, more than $70 million in cost avoidance.
MGC self-performed the mass and structural excavation for the campus, including the engineered excavation support and precise grading required for the partially buried reservoir. MGC also performed substantial trench excavation for the 16- to 24-inch offsite transmission pipelines that connect multiple well sites to a large-diameter collector main. Along with the tank and pump station, the project delivered hydropneumatic tanks, chlorine disinfection, administration, electrical, and chemical buildings, extensive yard piping, and interconnections to existing infrastructure. Utility corridors and site layouts were designed so future expansion could proceed without rework. When mid-construction changes arose, including new raw water tie-ins for additional development wells and site reconfiguration for a future City facility, MGC integrated them without affecting schedule or budget. The campus was completed under the approved $50 million budget and in time to meet critical summer water demand, giving Buckeye a safe, flexible, and future-ready water supply.
Key Features
- In collaboration with Hazen & Sawyer
- Winner of the AZ Water 2026 Water Treatment Project of the Year Award
- 2.0 MGD Phase 1, expandable to 16 MGD
- 2.8 MG prestressed concrete reservoir
- Deck-mounted booster pump station
- Blending and treatment facilities
- Operations and chemical buildings
- 16″–24″ transmission pipelines
- Self-performed excavation and earthwork
- Multi-site well connections